After some 40 loads of dirt are brought in, leveled, and compacted both inside and outside the stem wall, the footings are now below the frost line (42 inches) and the stem wall is ready for the lower level to be stacked on top.
Tuesday, June 12, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment