Sunday, September 16, 2007

The propane tank is finally installed. Hopefully, it won't need to be filled but once a year. Also, a view of the road side of the house.
Posted by Picasa
A dumpster loaded with drywall scraps (among other construction materials) as the hangers are just about finished.
Posted by Picasa
Here are a couple casualties of the drywall boom truck getting stuck attempting to load drywall in the front door on the second level.

Posted by Picasa
Here are some shots of the outside of the house to show the Azek trim that needed to be applied around the windows, doors, corners, and gables before the rest of the house could be sprayed with stucco. It has been a long time to wait for the trim to be ordered and applied. Hopefully, we can still get the exterior finished before rain and snow arrives.

Posted by Picasa
Finally, by popular request--A virtual tour of inside the house after the drywall has been 95% hung, but before it is taped and finished.

Posted by Picasa

Posted by Picasa


Posted by Picasa


Posted by Picasa

Posted by Picasa


Posted by Picasa
A few more retaining wall pictures
Posted by Picasa


Posted by Picasa
Here are the results of two and a half (long) days--A much needed retaining wall with steps that go down to the lake. Another few long days, and it should be completed before the fall rains come.
Posted by Picasa


Posted by Picasa


Posted by Picasa