Sunday, August 19, 2007

A couple of views of the lake after wrapping of a week of slow but steady progress.
Posted by Picasa
Posted by Picasa
The doors, along with temporary hardware are added to get ready for completely securing the house.
Posted by Picasa
Here, progress is being made on installing the facia and soffit but it is a painstakingly slow process because of the height and because Pat wants to make sure it is "bee proof". Hopefully, you can see it is one of the most perfectly detailed parts of the exterior.
Posted by Picasa
Posted by Picasa



Posted by Picasa
Posted by Picasa
Through the sliding glass door opening, a large freighter heads towards the Manistique port probably because of winds gusting over 30 miles per hour.
Posted by Picasa
Here is the progress that was made inside the house over the past week.

Posted by Picasa
Posted by Picasa



Posted by Picasa
Here are some pictures of the lake side of the house after the windows are in but before the stucco is on
Posted by Picasa



Posted by Picasa
After the shingles are on but before all the windows are in.


Posted by Picasa

Sunday, August 5, 2007

Some views of the interior framing of the main floor which is nearly completed. Since the only bedroom on this level is the master bedroom, this floor is "wide open".
Posted by Picasa


Posted by Picasa