Monday, February 25, 2008

Finally! The kitchen is done (except for the Crown Molding along the top)

About one more week and the inside should be finished, not including the finishing of the extensive woodwork which I am saving for Diane.


Posted by Picasa

Friday, February 22, 2008

Progress at last!

Posted by Picasa
More kitchen cabinets and countertops go in and are ready for the plumber to hook up the sinks and dishwasher.

Posted by Picasa


Posted by Picasa
The hardwood floor is finally finished! All that is left is the baseboard trim to put on the finishing touch.

Posted by Picasa
The master bath vanity and countertop get installed. Now waiting for the plumber to finish the job by installing the sink and the rest of the fixtures.

Posted by Picasa

Tuesday, February 19, 2008

The lake is frozen as far as the eye can see. Even the Mackinaw Straits are completely frozen from the lower to the upper peninsula.
Posted by Picasa
To say we've had "some snow" would be like saying Bill Gates saying he has a few dollars in the bank.


Posted by Picasa
A few early pictures of the kitchen countertops while we were waiting for a special order lazy susan to complete the cabinet installation.
Posted by Picasa

More ceramic tile. This time its on the walls around the guest bath. This is before the grout is applied.

Posted by Picasa
More hardwood floor pictures. Progress is extremely slow.

Posted by Picasa